
WG02F05807 GE Range Terminal Block Long Leads
Part #: WG02F05807
Genuine OEM GE Part
Product Description
Terminal block long leads works with some GE models of stoves / ovens / ranges.
This is a genuine OEM item made by GE
Product Description
Terminal block long leads works with some GE models of stoves / ovens / ranges.
This is a genuine OEM item made by GE